Full Bathroom Renovation in Lathom, Lancashire

Moran Plumbing recently completed a full bathroom renovation in Lathom, Lancashire, taking the existing bathroom back to its basic structure before rebuilding the room into a modern, practical space.

Project Overview

This project involved much more than replacing the old bathroom suite. We stripped out the existing bathroom, removed the old tiles and prepared the room for a complete refurbishment. All walls and the ceiling were then re-plastered, giving us clean surfaces ready for the next stages of the renovation.

The plumbing was prepared for the new layout and bathroom fittings. We installed a new shower, toilet, wash basin, bath and heated towel rail. Electric underfloor heating was also fitted beneath the new bathroom floor, providing additional warmth and comfort.

The project photos show the bathroom at different stages, from the initial strip-out and exposed pipework through to the finished room.

Take a look at the project process below from start to finish!

Stripping Out the Old Bathroom

The first stage of this bathroom renovation in Lathom was removing the existing bathroom fittings, tiles and old finishes.

For a full renovation, stripping the room back gives us access to areas that would otherwise remain hidden. This makes it possible to inspect the existing plumbing, alter pipework where necessary and properly prepare the walls and floors before new fittings are installed.

Sections of the floor were opened to provide access for the plumbing work. The old wall coverings and tiles were also removed, leaving the room ready for the new installation.

Although much of this work is hidden once the bathroom is finished, getting these early stages right is an important part of a bathroom renovation.

Complete Re-Plastering of the Bathroom

Once the strip-out and initial plumbing work had been completed, the walls and ceiling were completely re-plastered.

Removing old bathroom tiles can leave behind damaged plaster, old adhesive and uneven surfaces. Rather than attempting to cover these areas, the walls were properly prepared and plastered again.

This provided smooth surfaces for the new bathroom design and helped create the clean finish visible in the completed photographs.

Re-plastering the entire room also gave us the opportunity to work from a fresh base rather than trying to fit the new bathroom around the condition of the old one.

New Bathroom Plumbing in Lathom

A major part of this renovation involved preparing the plumbing for the new bathroom fixtures.

With the room stripped back, pipework could be installed and positioned before the walls, floors and tiles were finished. The project photographs show new copper pipework being run through the room and into the required positions.

Once this work was complete, the plumbing could be concealed beneath the finished surfaces.

The new bathroom included:

  • Freestanding-style bath
  • Walk-in shower
  • Toilet
  • Wash basin and vanity unit
  • Heated towel rail
  • New bathroom pipework where required
  • Electric underfloor heating
  • New wall and floor tiles

This approach allowed the practical plumbing work and the finished bathroom design to be dealt with as part of the same renovation.

Walk-In Shower Installation

The completed bathroom includes a spacious walk-in shower with a clear glass screen.

Light-coloured large-format tiles were used throughout the shower area, while black shower fittings create a strong contrast against the neutral background.

The shower includes a large overhead rainfall shower as well as a separate handheld shower head. A simple glass screen separates the showering area without making the bathroom feel enclosed.

Preparing the plumbing before tiling also allowed the shower fittings and pipework to be positioned neatly within the finished bathroom.

New Bath and Wall-Mounted Taps

A new freestanding-style bath was installed beneath the bathroom window.

Rather than fitting taps directly onto the bath, black wall-mounted controls and a matching bath spout were installed. The concealed plumbing for these fittings was prepared before the wall was tiled.

Positioning the bath beneath the window makes good use of the available room while leaving space for the separate walk-in shower, toilet and vanity unit.

The white bath also works well with the light wall tiles and darker bathroom fittings used throughout the renovation.

Wash Basin and Vanity Unit

The new wash basin was installed on a wall-mounted wood-effect vanity unit.

The vanity provides useful storage while keeping the floor beneath it clear. This helps create a cleaner appearance and prevents a large piece of bathroom furniture from making the room feel crowded.

A black basin tap continues the same finish used for the bath and shower fittings.

Above the vanity, a large round illuminated mirror provides a practical finishing feature and additional lighting around the wash basin.

Electric Underfloor Heating Installation

One of the additional improvements made during this bathroom renovation in Lathom, Lancashire was the installation of electric underfloor heating.

The project photographs show the electric heating mat positioned across the bathroom floor before the finished flooring was installed.

Bathrooms are particularly suited to underfloor heating because tiled floors can feel cold, especially during the colder months. Heating from beneath the floor creates a more comfortable surface without requiring additional wall space.

Installing the system as part of a full renovation also makes sense because the floor is already being prepared for new tiles.

Once installed, the heating system becomes completely hidden beneath the finished bathroom floor.

New Bathroom Tiling

Large-format tiles were chosen to create a clean and simple finish throughout the bathroom.

Light neutral shades help reflect natural light from the window and keep the finished room bright. The tiles continue around the shower, bath, toilet and vanity areas, creating a consistent appearance across the room.

The neutral tile colour also provides a good background for the black fittings.

Rather than introducing too many different colours and finishes, the completed bathroom uses a simple combination of white sanitary ware, light tiles, wood-effect furniture and black fittings.

A Modern Bathroom With Practical Features

The completed bathroom has been designed around everyday use.

There is a separate bath and walk-in shower, giving the homeowner the choice of either option. The vanity provides storage, while the heated towel rail and electric underfloor heating add warmth to the room.

Black fittings are used throughout the bathroom, including the shower, bath controls, taps and towel rail. These darker details stand out against the light tiles without overpowering the room.

The result is a bright and practical bathroom that makes good use of the available space.

From Strip-Out to Finished Bathroom

One of the best ways to understand the scale of this renovation is to compare the progress photographs with the finished bathroom.

The early photographs show the room stripped back, with old tiles removed, sections of flooring lifted and plumbing exposed. Later photographs show the walls freshly plastered and new pipework being installed.

The electric underfloor heating was then laid before the finished floor was completed.

Once the preparation and hidden plumbing work had been dealt with, the bathroom could move into its final stages. The new tiles, bath, shower, toilet, vanity unit, basin, taps and other fittings were installed to complete the room.

This project demonstrates why a full bathroom renovation involves considerably more than simply removing one bathroom suite and fitting another.

Much of the important work takes place before the customer sees the finished bathroom.

Bathroom Renovations in Lathom and Lancashire

At Moran Plumbing, we carry out bathroom renovations for homeowners in Lathom and surrounding areas of Lancashire.

Whether you have an older bathroom that needs completely stripping out or you want to change the layout and install new fittings, we can help with the plumbing and installation work required to bring the room together.

A bathroom renovation can involve several different stages. Proper planning is important when plumbing, plastering, tiling, heating and bathroom fittings all need to work together.

This recent Lathom project is a good example. The room was taken back to its basic structure before being rebuilt with new plumbing, freshly plastered walls and ceiling, underfloor heating and a complete new bathroom suite.

The finished space now includes a separate bath and shower, modern vanity unit, new toilet, heated towel rail and electric underfloor heating.

Planning a Bathroom Renovation in Lathom?

If your current bathroom is dated, difficult to use or simply no longer suits your home, a full renovation gives you the opportunity to start again.

At Moran Plumbing, we can help with the plumbing and bathroom installation work needed to turn an older bathroom into a practical new space.

Contact Moran Plumbing today to discuss your bathroom renovation in Lathom, Lancashire, and arrange a quote.

Call us now: 07802296260

Call Us