We have recently come to the end of a project we have been involved with for the past 12 months, the building required underpinning and then was extensively renovated.
Our work involved removing the existing plumbing and heating system and once the new subfloor was completed we installed, tested, and installed the complete new system.
A new bathroom was created along with a cloakroom suite under the stairs, the existing bathroom was also renovated.
A new central heating system was installed, and we fitted 15 traditional-style radiators in keeping with the refurbishment, in the bathrooms we installed 2 towel rails in each, one working of the central heating system and one working of the domestic hot water system to allow for warm towels when the central heating was not required.